Try to estimate the time to do each small task, sum up, then multiply by 2 (test, client interaction, integration...)
You can get better at that factor. Keep a backlog of
your estimates and the actual time you actually needed.
This way, you can adjust the multiplication factor for
future estimates. The factor will vary with many influences, including working environment, project scope,
growing experience, business domain, quality requirements,
and so on ad infinitum. Still, you will get much better
estimates by recording your past performance, and extrapolating from that by way of an adjusted multiplication
factor.
Christian Lemburg
Brainbench MVP for Perl
http://www.brainbench.com
-
Are you posting in the right place? Check out Where do I post X? to know for sure.
-
Posts may use any of the Perl Monks Approved HTML tags. Currently these include the following:
<code> <a> <b> <big>
<blockquote> <br /> <dd>
<dl> <dt> <em> <font>
<h1> <h2> <h3> <h4>
<h5> <h6> <hr /> <i>
<li> <nbsp> <ol> <p>
<small> <strike> <strong>
<sub> <sup> <table>
<td> <th> <tr> <tt>
<u> <ul>
-
Snippets of code should be wrapped in
<code> tags not
<pre> tags. In fact, <pre>
tags should generally be avoided. If they must
be used, extreme care should be
taken to ensure that their contents do not
have long lines (<70 chars), in order to prevent
horizontal scrolling (and possible janitor
intervention).
-
Want more info? How to link
or How to display code and escape characters
are good places to start.
|